BIOROCK-S Installation in Berkshire

BIOROCK-S Installation in Berkshire

Location

Maidenhead, Berkshire

Project

2 Bedroom Annex with Studio.

System

BIOROCK-S System with ST1-2000 Primary Tank & BIOROCK-S Treatment Unit

Background

The client had the option to connect to the mains but the costs, permitting time, and access permits proved prohibitive. As the plant was to be located quite close to the building the client also wanted a plant without noise and with minimum maintenance. It was also planned to discharge to a nearby stream and required a high-quality final effluent.

Installation

Installation was carried out by the clients' contractor under the supervision of a BIOROCK engineer and was completed in less than 2 days.

Haluatko ottaa meihin yhteyttä?

Hei, olen José Manuel Rodríguez , BIOROCKin International Sales Director. Ota nyt yhteyttä ja pyydä ILMAINEN hankearviointi

Missä olet?

Kuka sinä olet?

Yhteystietosi

Puhelimen etuliite asetetaan automaattisesti maan valinnan jälkeen

Millaisesta tuotteesta olet kiinnostunut?

Jos valitset jonkin muun vaihtoehdon, täsmennä se huomautuskentässä.

Miten voimme auttaa sinua